Sod installation in Reno

Laying sod is the fastest way to a new lawn, but in Reno the soil prep and watering plan matter as much as the sod. Here's what to expect, and a quick way to reach a local pro.

Get matched Takes about a minute.

What a sod job includes

  1. Remove the old lawn or weeds and haul it off.
  2. Grade the area so water drains away from the house.
  3. Loosen compacted soil and work in organic matter.
  4. Check and adjust the sprinkler heads for full coverage.
  5. Lay sod with tight, staggered seams and roll it.
  6. Water it in and set a schedule for the first weeks.

Sod, seed or hydroseed?

Sod gives an instant lawn. Seed is slower. Hydroseed sprays seed, mulch and nutrients together. Ask your contractor which suits your yard's size, slope and timing.

Soil prep matters here

UNR Extension says compacted soils restrict roots and recommends working in organic matter. It also notes most northern Nevada soils are alkaline (UNR 3066; UNR 3418). A good bid explains how the soil will be loosened and amended before sod goes down.

Watering new sod

TMWA's assigned-day schedule applies to sprinklers (TMWA). We didn't find a TMWA rule giving new sod extra days, so ask TMWA or your contractor how to handle establishment watering.

Check the sprinklers first

New sod over a sprinkler system with bad coverage tends to fail in patches. Ask whether the bid includes checking heads and coverage before laying sod.

Timing

Ask your installer which months they suggest for your yard. A summer install needs close attention to watering within TMWA's rules (TMWA).

What affects the price

We don't quote prices; the pro who visits sets the price. These are the things that usually move a bid:

  • Square footage
  • Removing the old lawn and haul-off
  • Grading and soil amendments
  • Sprinkler repairs or new zones
  • Grass type and delivery

Questions to ask your contractor

  • How will you prepare and amend the soil?
  • Does the bid include checking sprinkler coverage?
  • How should I water during establishment on my TMWA days?

Frequently asked questions

Can I water new sod every day?

TMWA's assigned days apply to sprinklers. We didn't find a new-lawn exception on tmwa.com, so ask TMWA.

How soon can I walk on new sod?

Ask your installer. Most suggest staying off it until roots knit into the soil, usually checked by gently lifting a corner.

Should I replace lawn with sod or xeriscape?

It depends on how you use the yard. Kids and pets often need some lawn. See xeriscape for the low-water option.

Ready to get matched?

Pick what you need and leave your contact info. An independent local pro gets in touch.

Related services and guides

Service areas

Get matched