Do you need a permit for walls, fences or patios in Reno?

In the City of Reno, every fence and wall needs a permit. Unincorporated Washoe County exempts low walls without a surcharge, low patios and driveways, short fences and small grading. Work in the street right-of-way needs a separate Public Works permit. Your contractor pulls permits, but it helps to know the rules.

Get matched Takes about a minute.

City of Reno: all fences and walls

The City's fences and walls handout (updated June 1, 2026) says: "Construction of all fences and walls in the City of Reno shall require a permit" (City of Reno). Heights are limited to 6 ft on lot lines outside required front yards and 4 ft in the required front yard. The plot plan must show easements and property lines (a survey may be required) and HOA approval if applicable.

Whether Reno exempts low flatwork the way Washoe County does isn't something we've confirmed. Ask your contractor.

Unincorporated Washoe County: the exempt list

Washoe County's "Work Exempt from a Building Permit" handout (Washoe County; no edition date printed) includes:

  • Retaining or rockery walls up to 48 inches from adjacent grade, only if they don't support a surcharge. Walls supporting any surcharge need a permit.
  • Patios, sidewalks and driveways no more than 30 inches above the lowest adjacent grade, without foundations, not over a septic system, basement or story below, and not part of an accessible route.
  • Residential fences up to 30 inches in the front yard or 6 ft elsewhere; like-for-like fence repair under 100 linear ft.
  • Decks up to 30 inches (all decks in the Tahoe Basin need a permit).
  • Sheds up to 200 sq ft with no electrical, mechanical or plumbing.
  • Grading under 50 cubic yards.

Exempt from a building permit doesn't mean exempt from zoning, setbacks or HOA rules.

Curb cuts and the right-of-way

Driveway approaches, curb cuts and public sidewalk work in Reno need a Public Works Encroachment/Excavation permit. Excavation requires a bond, insurance naming the City and USA North 811 notice. The City quotes 3 to 5 days for smaller projects and 3 to 5 weeks for larger ones (City of Reno).

Lake Tahoe

In the Tahoe Basin, Washoe's exemptions only apply if the work doesn't create TRPA land coverage. See TRPA's exempt activities packet.

Sparks, Carson City and other towns

We haven't verified thresholds for Sparks, Carson City, Douglas, Lyon or Storey counties. Your contractor confirms with the local building office. See service areas for links.

Frequently asked questions

Do I need a permit for a fence in Reno?

Yes. The City of Reno requires a permit for all fences and walls.

How tall can a wall be without a permit in Washoe County?

Up to 48 inches, with no surcharge, in unincorporated Washoe County.

Do patio pavers need a permit?

In unincorporated Washoe County, patios up to 30 inches above grade without foundations are exempt. Elsewhere, ask.

Ready to get matched?

Pick what you need and leave your contact info. An independent local pro gets in touch.

Related pages

Get matched